Calder Stewart now underway constructing a new logistics and retail facility for NZ Safety Blackwoods. Building will be 16,500m2 and on a 2.6ha site at Drury South Crossing.
Calder Stewart now underway constructing a new logistics and retail facility for NZ Safety Blackwoods. Building will be 16,500m2 and on a 2.6ha site at Drury South Crossing.